Lamtluang Online News, Mizoram, 27 October 2024 : The United Pentecostal Church of Mizoram's Ladies Auxiliary Department (LAD) is currently hosting its 28th conference in Ruantlang, commencing on Friday evening and concluding tonight. The event has drawn a significant number of delegates to the Rephidim Pandal.
Cross column
Sunday, 27 October 2024
TLAWNG BRIDGE OFFICIALLY OPENED ON OCTOBER 25, 2024
Lamtluang Online News, Mizoram: Er. Lalrinkima Hnamte, PWD Engineer-in-Chief, Mizoram has officially opened the Tlawng Lei bridge on Reiek Road for public use on 25 October 2024. This significant infrastructure project boasts impressive features, including a length of 55 meters and a width of 12.2 meters, with a 7.5-meter-wide carriageway and 1.2-meter-wide pedestrian paths on both sides. The bridge's railing stands at an impressive 7 meters high.
Key Bridge Features:
- Length: 55 meters
- Width: 12.2 meters
- Carriageway Width: 7.5 meters
- Pedestrian Path Width: 1.2 meters (on both sides)
- Railing Height: 7 meters
Project Details:
- Sanctioned Amount: Rs. 757.56 lakhs
- Construction Start Date: February 28, 2017
- Design Change: From Pre-Stressed Concrete Bridge to Double Lane Built-Up Steel Girder Bridge
Construction began on February 28, 2017, but faced setbacks due to heavy rainfall in June 2017, causing the Tlawng River to swell 5.05 meters above the High Flood Level. This necessitated a design change to ensure the bridge's stability and safety.
The inauguration ceremony was attended by prominent officials, including Er. Lalrinkima, Er. H. Zoramliana, Chief Engineer (Highways), Er. R. Lalpeka, Senior Executive Engineer, and members of Reiek and Ailawng Village Councils. Er. Lalrinngheta, Superintending Engineer, Central Circle, delivered the closing remarks.
Electrification work, targeting 70 tons, has been awarded to M/S Satguru Engineers & Allied Services Pvt. Ltd., Guwahati, with vehicle movement restricted during this period to ensure safety.
Source: DIPR Mizoram
DC KOLASIB CHAIRS CRUCIAL MEETING ON BAIRABI-SAIRANG RAILWAY PROJECT PROGRESS
Lamtluang Online News, Mizoram : On October 26, 2024, Pu Robert C. Lalhmangaiha, Deputy Commissioner of Kolasib, led a significant meeting at the DC Conference Hall to discuss the progress of the Bairabi-Sairang railway project. The meeting brought together key stakeholders, including district officials, Indian Railway authorities, and Virtual Committee members.
Key Discussion Points:
- Fast-Tracking Unresolved Private Land Acquisitions: Resolving pending land acquisition issues to pave the way for the project's progress.
- Addressing Village Complaints: Resolving grievances from Hortoki, Mualkhang, and Khanmrang villages.
- Resolving Public Issues: Addressing problems caused by contractor works.
- Outstanding Compensation : Settling pending compensation for landowners and electric pole installations.
- Joint Verification: Collaborative verification by district authorities, railway staff, and village councils.
Railway officials aim to extend the line to Mualkhang by March 25, 2025, marking a significant milestone in the project's timeline. Additionally, repairs to landslide-damaged tracks in Assam have been completed, enabling goods trains to operate, with passenger trains expected to resume soon.
Source: DIPR Mizoram
Mizoram Chief Minister Lalduhoma Hosts Press Conference Following New Delhi Visit
Lamtluang Online News, Aizawl: On October 26, 2024, Chief Minister Pu Lalduhoma addressed the media in Aizawl, detailing his productive meetings with top central leaders during his week-long visit to New Delhi. Key discussions were held with Prime Minister Narendra Modi, Union Home Minister Amit Shah, Defence Minister Rajnath Singh, and Minister of Commerce & Industries Piyush Goyal.
A notable outcome was the signing of a Memorandum of Agreement to relocate the Assam Rifles Battalion from Aizawl City to Zokhawsang, inked on October 23, 2024. The Chief Minister also shared updates on other significant meetings and programs attended during his trip.
Source: Department of Information and Public Relations (DIPR), Mizoram
![]() |
Lalduhoma, Mizoram Chief Minister Press Conference on 26 October 2024 |
Subscribe to:
Posts (Atom)